In this paper an experimental plan of transpiration control system is also provided, including the hardware and software of the interface with the computer, and the coolant supply system.
本文还提供了发汗控制系统的实验方案,包括系统的计算机接口、硬件和软件以及发汗供给系统的实施方案。
The theory and practice of realizing the plan progress control of basic construction process and tracing management with computer technology were introduced.
介绍了应用计算机技术实现基本建设过程计划进度控制和跟踪管理的理论及实践。
应用推荐