wharf to wharf transport 码头至码头运输
The suspended tube 'hovering' over the wharf, creates space at the wharf level to move around and experience the edge; where the vessels meet the water.
悬浮在码头上空的管道,在码头标高创建了一个可以到处移动和感受水边的空间,同时军舰也可以满足足够的水位。
As the wharf has received ships in excessive size than the designed ships, it is necessary to assess the berthing capability of the existing wharf.
由于码头存在靠泊超设计船型船舶的情况,因此,对库区现有码头进行靠泊能力评估是十分必要的。
This need has put up a higher request to the structure of the wharf, and it needs us to do more work on studying the new structure type wharf.
大型深水专业化码头的建设,对码头的结构型式提出了更高的要求,这需要港口工程界在开发新型码头结构的工作中加大研究力度。
Canary Wharf looks different compared to other parts of London.
比起伦敦的其他地方,金丝雀码头看上去很不一样。
应用推荐