Increasing the water injection delay time and water injection pressure resulted in slightly decrease of the residual wall thicknesses of post-filled region.
提高注水压力与增加注水延迟时间时注水后填充部分的残留壁厚略有减小。
Due to high water injection pressure, it is difficult to transport the logging cable into water injection WLL by its own weight during well logging process.
在注水井带压测试工艺中,由于注水压力的影响,测井电缆依靠自身质量无法向井下输送,为此开发研制了测井电缆带压下井输送器。
Results shows application of this technology will ensure higher formation temperature, improved water injection effect, lower water injection pressure and faster development speed.
结果表明,利用该技术可提高地层温度,提高注水井的注水效果,降低注水压力,提高区块的开发速度;
应用推荐