Article 4The priority in water conservancy construction during the period of implementation of this Policy shall be: flood prevention control harnessing projects of rivers and lakes, urban flood prevention, construction for the safety of flood storage and detention areas, maintenance and construction of sea dykes, renewal and transformation of existing water conservancy installations, especially elimination of dangers and consolidation of sick and dangerous reservoirs and embankments, drinking water for humans and animals in drought-stricken areas, trans-regional water diversion projects and projects of water sources in regions short of water resources, water supply, economy in water and protection of water resources, irrigation and drainage of farmland, water and soil conservation, integrated utilization of water resources, hydro-power generation and research and development projects of water conservancy technology.
基于6个网页-相关网页
The Greenway Framework expands the flood-prevention strategies for Brays Bayou into an environmentally and culturally regenerative design and implementation strategy for a dynamic urban greenway.
该绿色通道为布雷海湾进入环境和文化再生设计和城市绿色通道战略性执行扩展了防洪策略。
Through this exploration, this paper contributes to the planning, design and flood prevention departments with tools to minimize urban flood disaster.
通过本文的探索,有助于给规划设计部门和防汛指挥部门提供工具,最大限度地减少城市洪涝灾害。
应用推荐