This paper introduces the transform of belt conveyor turning part, setting up adjustment principle and ways.
介绍带式输送机转弯段的改造、安装调试原理和方法。
Geological landslides and technical over-break in turning part shall be measured again and converted to total length of the tunnel.
地质塌方、转弯段的技术性超挖按实计量并折算成隧道延米计价。
But part of our earlier assumption is turning out to be very wrong.
但是部分我们先前的预测是错误的。
应用推荐