Table 5 provides the timing results for all mutation benchmarks, using 480-item plan lengths.
表 5 提供了所有字符变换测评的计时结果,使用了 480 项计划长度。
If you want other items of extra-curricular activities, must bear in mind the timing of the plan included in the study table.
如果你想搞其它项目课外活动,切记一定要将其列入学习时间安排计划表内。
Working table, water temperature, oil temperature, current, and working timing are all in sight.
工作台,水温,油温,电流,工作计时,一目了然。
应用推荐