Route optimization problem in multimodal transport directly influences the freightage cost, freightage time and freightage quality.
多式联运路线优化问题直接关系到货物运输的费用、时间和运输质量。
How to carries on the comprehensive optimization and the management of cost, time, quality and security, is another challenge to the integrated management of construction project objects.
如何对成本、工期、质量和安全进行全面的优化和管理,是对施工项目目标集成管理所提出的又一挑战。
The shortage of the current optimization models and solution methods were analyzed, and the main factors affecting the quality, building time and cost of prototypes were discussed.
分析了目前分层方向优化模型和求解方法中的不足,讨论了影响原型制作质量、制作时间和制作成本的主要因素。
应用推荐