Three Gorges Project lock 三峡船闸
three gorges shipping lock 三峡船闸
Three Gorges permanent lock 三峡永久船闸
the three gorges ship lock 三峡船闸
The paper presents various temperature control measures taken in ground concrete placement at permanent lock of Three Gorges Project during summer construction of 1999 .
介绍了三峡工程永久船闸地面混凝土在1999年夏季施工中所进行的各种温控措施。
In underground water conveyance system for Three Gorges Projects permanent lock, the inclined shafts are large in number, short in length, complex in structure, changeable in height and so on.
针对三峡工程永久船闸地下输水系统斜井具有数量多、长度短、体型复杂、边墙高度逐渐变化等特点。
Some ideas on improvement of lock capacity and establishment of mediation system at Three Gorges Ship Lock are put forward.
本文对三峡船闸提高通过能力和建立疏通机制提出了看法。
应用推荐