this paper makes presentation of 125mw steam turbine structure features elaborates calculation of alignment of hp and ip rotor and lp rotor system with cases meanwhile describes experiences of adjustment of whole rotor system for better handling the similar problems in future practice
介绍了125mw汽轮机的结构特点,并结合实例阐述了高压、低压转子系统的校中计算,同时介绍了整个转子系统的调整经验,以便在今后的实践中更好地处理类似问题
以上为机器翻译结果,长、整句建议使用 人工翻译 。
应用推荐