The diet, age and growth of Hemimyzon sinensis in lower reaches of the Jinsha-jiang River were studied.
对金沙江下游中华间吸鳅的食性和年龄生长进行了初步研究。
The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River.
虎跳峡水电站是金沙江中下游梯级的龙头电站,该电站的开发建设对金沙江水电梯级开发和“西电东送”的实施具有重要的战略意义;
应用推荐