The principle of this method is to standardize the method by which manufacturers may demonstrate that their spark testing is effective in detecting faults in the insulation as specified in clause 9.
这个方法的原则是为了证明哪个制造商所进行的绝缘火花试验是符合第9条规定的标准的。
Clause 11 testing - all testing requirements, both on completion of the Design-Build and prior to completion of the Contract are now covered in this Clause.
第十一条检验—所有的检验要求,无论是设计—建造竣工的检验或者是合同完结前的的检验,均涵盖在本条中。
This edition of BS 5099 introduces a clause on calibration frequency, together with an associated annex on the procedure for checking the efficacy of the method of spark testing.
此版本的BS 5099在附件里增添了火花试机的校准周期以及校准的方法和程序。
应用推荐