After the steam superheater was connected in series with a set of flue gas cooler, not only solved the above mentioned problems, but also made full use of flue gas surplus heat.
与蒸汽过热器串联一台烟气冷却器,不仅解决了上述问题,还充分利用了烟气多余的热量。
It is found that the main cause of tubes bursting is the flame in the burner washing down watercooled wall and the uneven distributed flue-temperature over the convection superheater.
认为炉内火焰冲刷水冷壁及对流过热器烟温分布不均是造成爆管的主要原因。
After the steam superheater was connected in series with a set of flue gas cooler, not only solved the above mentioned problems, but also made full use of flue gas surplus he...
与蒸汽过热器串联一台烟气冷却器,不仅解决了上述问题,还充分利用了烟气多余的热量。
应用推荐