Based on the field loading tests and FEM numerical simulation analysis, the paper probes into the potential bearing capacity of large diameter and super-long bored-cast-place piles.
基于入和没入硬层时有限元数值模拟对比分析和持力层不同时同场地现场对比试验资料分析,对大直径超长灌注桩的承载潜力问题进行了探讨。
To improve the bearing capacity of piles under Sutong Yangtze River Bridge, different post grouting techniques were adopted to large diameter and super-long piles.
为提高苏通大桥桩基础的承载力,将不同后压浆工艺应用于苏通大桥大直径超长桩中。
应用推荐