This paper proposes a practical two-phase approach to substation optimization planning.
提出了一种变电站两阶段优化规划方法。
Installation of voltage reactive comprehensive device in substation is an effective way to realize voltage automatic control and reactive optimization.
在变电站安装电压无功综合控制装置是实现电压自动控制和无功优化的一种有效方法。
Relevant studies such as the transmission ability between west and east Hubei grid and the optimization of the adjacent grid of Jingmen substation were also made.
同时对湖北鄂西-鄂东断面输送能力、荆门近区网架优化等相关问题进行研究。
应用推荐