After a task is successfully scheduled, you can see the task details under the task details sub-component as a new row, similar to Figure 17.
在成功地调度一个任务之后,可以在Task details子组件中新出现的行中看到任务的详细信息,见图17。
So points in same row between sub plots to be joined by lines.
所以点在同一行之间的情节,加入了线。
The intrinsic (sub)shell structure and core (valence) shell structure of atoms from the first- to the fifth- row in the periodic table are evaluated.
依据该理论,对前五周期原子的内禀(亚)壳层结构、内实(价)壳层结构进行了研究。
应用推荐