The mold of the parts is parts of the wall, after Stripping posted on the core, the agency launched using a wall around parts wear core putt.
该模具消费的制件是长壁制件,脱模后贴在型芯上,推出机构用的是接近制件壁穿型芯的推杆。
This research was done on the tensile behavior of high performance cement-mortar to concrete through core-drilling and pull-stripping test.
研究了高性能水泥复合砂浆与混凝土之间的粘结性能。
应用推荐