This paper analyzed the problems existing in the commissioning of heat recovery boiler and steam turbine in a175MW gas-steam combined cycle generating unit and put forward the improvement proposals.
针对某175MW燃气-蒸汽联合循环机组中余热锅炉和蒸汽轮机调试存在的问题进行分析,提出改进意见。
In large power plant, wet steam in turbine and water in turbine oil and wet hydrogen in hydrogen-cooled generator will decrease safety and economic of turbine generating unit.
在大型火力发电厂中,汽轮机内蒸汽湿度、透平油中含水率和氢冷发电机中氢气湿度都直接影响着机组的安全经济运行。