In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.
介绍大跨度不对称曲线预应力混凝土连续梁桥的设计和成桥后的静、动载试验。
The high strain dynamic load tests, vertical static load tests and horizontal load tests for part of PHC trial piles of East China Sea Bridge are described.
介绍东海大桥部分PHC试桩的高应变动测、竖向静载和水平荷载试验情况。
Load master bridge test is a prerequisite for successful trials, the paper bridge static and dynamic tests conducted in-depth research methods.
掌握桥梁试验方法是荷载试验取得成功的先决条件,本文对桥梁静、动载试验方法进行了深入研究。
应用推荐