Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.
在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。
In order to execute the standard, this paper introduces the corresponding research on developing the measurement system of vehicle's fuel evaporative pollutants emissions.
为了积极配合这一标准的执行,本文介绍了研制汽车燃油蒸发污染物排放测试系统的相关研究工作。
The Timing System could provide the 1PPS, 10PPS frequency standard and corresponding timing to user side.
本时间统一系统向用户端提供1PPS、10PPS两种时间信号及其各自对应的时间信息;
应用推荐