The stability problem of the ventilating silo and transport business process for the longitudinal ventilated tunnel will arise during the construction.
在纵向式通风的隧道中,不可避免的出现通风竖井在施工和营运过程中的稳定性问题。
The simulation and monitor of the structure construction process and the analysis of stability are important steps to guarantee safety in the construction course and the normal use in the future.
因此大跨空间结构施工过程的模拟与监测和稳定性的分析是保证结构施工过程安全性和日后正常使用的重要环节。
For the successful operations of drilling and completion of the branch wells. it is necessary to maintain borehole stability in construction process.
为了保证分支井钻井和完井作业的顺利进行,必须在施工过程中确保井眼的稳定。
应用推荐