Songjiazhuang Subway Station 号线宋家庄站
Conductor: Yes, you take the train to Songjiazhuang direction, and go nine stops.
是的,你坐开往宋家庄方向的列车,一种九站路。
The contact rail system of Songjiazhuang park station is composed of steel-aluminum contact rail and GRP guard shield.
宋家庄停车场接触轨系统采用钢铝复合接触轨和玻璃钢护罩。
In this thesis, the station of Beijing Subway Songjiazhuang of engineering practice, to help pick up the station building on the existing structure of the station were analyzed.
本论文针对北京地铁宋家庄车站工程实际,对后续车站帮接建设对既有车站结构的影响进行分析研究。
应用推荐