the soil-stone embankment 土石复合路堤
It is not easy to assure the construction quality when the highway is constructing in the stage of soil-stone embankment in hithy areas.
在山区高等级公路建设中,经常会遇到土石混填的路堤,如何保证其施工质量是施工中不易解决的问题。
By analyzing and discussing settlement after construction of fillings in the article, it is show that stone is prior to soil to fill high embankment.
本文对填筑体的工后沉降进行了较为深入的分析探讨,验证了高填方填筑体应优先采用石料的结论。
应用推荐