By monitoring both voltage and power, the unit measures the normal working load, then calculates and sets an automatic shutdown point for detected power changes.
通过监测动力电压,该装置先对正常的工作量进行测定,然后依据被测动力发生的变化,估计并设定一个自动的关闭点。
For the ballistic missile using perturbation guidance, the computation of partial derivative at shutdown point is very important for data calculation and validation.
对摄动制导的弹道导弹而言,关机点偏导数和全导数计算及其校验是导弹诸元计算中的重要环节。
However, the pages will need to be written to disk at some point, which could be as late as during database shutdown.
然而,这些页需要在某一时刻写到磁盘上,这个时刻可能会在数据库关闭时才会轮到。
应用推荐