Abstract:Reinforced concrete structures to ensure the quality of components in the concrete construction, to sum up the number of“secondary”Construction Technology: the second batch;the second mixing method; the second vibration; Second-pressure method.
基于1个网页-相关网页
The second presents the marching iteration method with pressure relaxation factor.
第二部分介绍带压力松弛因子的推进迭代方法;
The second method assumes the pressure boundary conditions between sub-domains, but USES a receding boundary approach to minimize the pressure errors.
第二种方法则是在各个次区域之间利用压力边界条件,同时利用后退边界方法来减少压力误差。
二次压光法。
应用推荐