Then, the WBS structure of aviation project is researched. The parameter calculating, the method of resource estimating, and responsibility assign matrix of the work package is provided.
研究了航空型号项目的WBS结构,工作包的参数计算、资源估算和工作责任矩阵;
Through the MDSD approach, we will assign responsibility for specific operations to these elements, and the designers will use this specification to create the element.
通过 MDSD 方法,我们将为这些元素指派负责特定操作的责任,设计者将使用这些规范来创建元素。
You can also see the names of the people with the primary responsibility for the area (which is defined by the roles you assign).
还可以在其中看到区域的主要负责人(由所分配的角色定义)。
应用推荐