The treatment process, design parameters, commissioning and operation of cyclic active sludge sequence system reactor were introduced, and some questions appearing in the operation were also analyzed.
介绍了循环序批式活性污泥反应器的工艺流程及设计参数、调试和运行情况,分析探讨了系统运行中出现的一些问题。
The commissioning is the last construction stage of a nuclear heating project. The commissioning quality will directly affect on the safe operation and availability of the heating reactor.
调试是核供热工程建设的最后阶段,调试质量的优劣将直接影响供热堆的安全运行和可利用率。
应用推荐