McMoran has since drilled a second well into Davy Jones (using a fatter pipe), proving that the reservoir structure stretches over 20, 000 acres, and is now drilling a second Blackbeard well, currently at a depth of 25, 200 feet.
FORBES: Updated 11:30 Central.