... 工厂拆除及搬迁Plant Removal and Relocation 项目总承包管理General Contractor Management 进度及成本控制Process and Cost Control ...
基于1个网页-相关网页
Under the consume of energy is not added, the output is increased and production cost of synthetic ammonia is reduced by advanced process equipment and control scheme.
在不增加能源消耗的情况下,采用先进的工艺设备和控制方案来提高合成氨产量,降低了生产成本。
Three controls were usually emphasized in the engineering project implementation process: quality control, progress control and cost control.
工程项目实施过程中通常强调三大控制:质量控制、工期控制、成本控制。
Through the audit on each process cost and processing charges and wastages, to well control the process cost.
通过各项成本、加工费用、损耗等合理性的审核,进行各项工序成本的控制;
应用推荐