Therefore, the pipe blockage was decreased, the maintenance cost was reduced.
并且管道堵塞减少、维修费用降低。
Combined with practical construction in this paper the reasons caused the pipe blockage of concrete transfer pump are introduced.
分析了钻(冲)孔灌注桩施工中堵管事故的原因,介绍了防止堵管的措施和堵管的处理方法。
During the cold seasons, outdoor compressed air of liquid water will freeze pipeline, cause blockage or burst pipe.
在寒冷的季节中,室外压缩空气管线中的液体水会冻结,引起管道堵塞或爆裂。
应用推荐