The ‘Task Resource Float’ is the amount of delay that can be applied to a task, performed by a Resource, without introducing a delay into another Critical Path task, performed by the same Resource.
任务资源浮动是指用到同一资源时,在不会另一个关键路径任务延迟的情况下,一个任务可以被延迟的时间。
In that dark state of not knowing, we float about without any control and cannot see the path ahead. These are the workings of karmic forces.
那个时候杳杳冥冥,就是由不得自己飘飘然,那个无法看到前面的道路,这就是「业力」。
In the practical engineering processes, the amount of resources is strictly limited, so in the actual engineering, the traditional CPM can not give the correct total float and critical path.
在实际工程中工序的资源量是受到严格限制的,传统的CPM法不能给出正确的工序总时差和关键路线。