The storm water division sump to be constructed in two times, first construction is for sole-plate and part of wall board; second construction is for wall top plate.
雨水分流集水井分两次施工,第一次为底板和部分墙板,第二次为墙顶板一次施工。
Two parts were included in this study, Microencapsulation of rose perfume with urea-formaldehyde resin wall were prepared by in-situ method in the first part.
本文研究工作分为两部分,第一部分是用原位聚合法以脲醛树脂为壁材制备缓释型香精微胶囊。
With two meters by ruler of wall structure, inspection, shall not exceed 5 mm maximum deviation, cut or out-of-tolerance part should be picked with a than three repair cement mortar leveling.
对结构墙体,用两米靠尺检查,最大偏差不得超过五毫米,超差部分应剔凿或用一比三水泥砂浆修补平整。
应用推荐