... 传输接收标准 over the air 过高变异数 over variance 过高/过低负载期间 over/under loaded period ...
基于18个网页-相关网页
over-all variance 总变异数
Figure 3: Risk, which greatly contributes to variance and unpredictability, is reduced over time in an iterative project.
图3:风险,主要代表了变化性和不可预测性,在项目的迭代中随着时间而降低。
Hence, the variance diminishes over time due to collaborative interaction on new knowledge acquisition.
因此,由于在新知识的获取方面进行合作交流,方差随着时间减少了。
However, for the composite load has the characteristics of complex composition, random time variance and spread over different area, its exact mathematics model is still not built up.
然而,系统中的综合负荷,由于具有构成复杂、随机时变、地域分散等特点,其准确的数学模型一直没有建立起来。
应用推荐