If an activity on the critical path is a week late, you can't sit idly and allow the entire project to be a week late.
如果处在关键路径上的某个活动延期了一周,你可不能傻坐着眼看整个项目延期一周。
This 20% of code is on the "critical path" and it is these areas that are worth optimizing for performance.
这20%的代码位于“关键路径”上,正是这些方面值得进行性能优化。
If not, determine the critical path and look for ways to accelerate these activities to get you back on track.
若否,找出关键路径,并寻找到加速执行相关工作的办法以便能让你重回正轨。
应用推荐