negative moment reinforcement 负力矩钢筋 ; 负弯矩钢筋
post-negative moment 后张法负弯矩
negative moment zone 负弯矩区
negative moment control 负弯矩控制
negative moment strength 负弯矩强度
Length of negative moment reinforcement and level of prestress were the main factors of the specimens.
试验中考虑了负弯矩筋长度和预应力度两个主要因素。
This paper introduces the construction and test techniques for prestressed and post-tensioned negative moment.
介绍了预应力后张法负弯矩的施工与检测技术。
The low grade of concrete and negative moment reinforcement descending cause the appearance of concrete crack in a workshop floor.
某工业厂房现浇混凝土楼面由于混凝土抗压强度偏低和负弯距钢筋下移,造成了抗弯承载力不足,出现了大量裂缝。
应用推荐