This paper introduces the research of upstream and downstream navigable channel scheme, sediment deposit and the measure to clean deposit in the channel in Three Gorges Project.
本文介绍了三峡工程上、下引航道布置方案与引航道内泥沙淤积及清淤措施的研究情况。
To ensure the safety of navigation and bridge, it should be considered to calculate the minimum navigable clearance dimensions of bridge in bridge construction and channel construction.
合理地确定通航桥梁的最小净空宽度,保证船队航行和桥梁安全,是桥梁建设和航道建设均应重视的问题。
Meanwhile, as it is nearly navigable in Songhuajiang river, Jilin will open up a new logistics channel to Russia shipping.
同时,随着松花江即将通航,吉林市的对俄罗斯航运将开辟新的物流通道。
应用推荐