船舶PSC检查滞留的常用缺陷处置代码含义及说明 ... Rectify Deficiencies Within 14 Days 在14天内纠正缺陷 Master Instructed to Rectify Deficiencies Before Departure 要求船长在离港前纠正缺陷 Rectify Deficiencies Within 3 Months 在三个月内纠正缺陷 ...
基于1个网页-相关网页
The distributed control system for chromatograph on-line monitoring of transformer oil is introduced, which is composed of a master computer and several terminal computers.
介绍了由一个主机、多个终端机组成的用于变压器油色谱在线监测的分布式控制系统。
The master computer is used as the centre of control system and synthetic judgment, and is connected with PLC by RS-485 communication line to perform real-time monitoring on local apparatus.
控制主机做为系统的控制和综合判断中心,利用RS-485通信线与PLC进行通信,实现现场设备的实时监控。
At the same time, in order to master the operating parameters and the state immediately, it is necessary to relay on the power control system for a real-time monitoring to get a timely respond.
同时为了及时了解电源系统的运行参数及运行状态,就要依赖电源监控系统进行实时监控,以便及时做出反应。
应用推荐