Passengers may change to ma On Shan Rail trains at Tai Wai.
乘客可以在大围站换乘马鞍山铁路列车。
The KCRC is planning and implementing West rail (Phase I), the Ma on Shan rail link, the TST Extension and the Sheung Shui to Lok Ma Chau spur line.
九广铁路公司现正进行西铁(第一期)、马鞍山铁路、尖沙咀支线和上水至落马洲延线的规划和实施工作。
The 11.4-kilometre Ma On Shan to Tai Wai rail link, that connects the existing KCR Tai Wai station and Lee On in the Ma On Shan new town;
马鞍山至大围铁路线全长11.4公里,连接位于 马鞍山新市镇的利安和九广铁路大围站。
应用推荐