The simplified mechanics model was built based on analyzing load of wire rope tie-in, and then a suit of high efficient testing equipment on tie-in performance was set up according to ine model.
基于对电梯钢丝绳接头荷载的分析,建立了绳头承载简化力学模型,并依此设计出一套高效的绳头性能试验装置。
A control scheme that trolley and pulley blocks can arrive at the preset positions as soon as possible and swinging Angle caused by wire rope and load inertias can be removed is obtained.
控制模型的目标是建立使小车和滑轮组尽快到达预定位置,并消除钢丝绳和负载由惯性所致摆角的控制方案。
According to the measured results, it discussed the affection of resisting force of mine, lifting load and the mass changing of steel-wire rope.
根据实测结果,讨论了矿井阻力、提升载荷及提升钢丝绳重量变化对实测的影响。
应用推荐