The project plan and schedule.
项目计划和工作流程计划。
The Contractor shall prepare a detailed test plan and schedule.
承包商应准备一份详细的试验方案与时间进度表。
Plan and schedule personnel and equipment for maximum efficiency.
最大效率地计划、安排人员及设备。
Plan and schedule qualification tests for each motor or gear component.
为电机或传动料件的测试评估做出计划并安排进度。
Leads high-level planning work sessions for program plan and schedule development.
领导针对计划和进度开发的高层计划工作会议。
However, it all comes down to managing a funded group of resources to a plan and schedule.
然而,归根结底就是为计划和进度表管理资源的资金小组。
Instead it is essential to PLAN and SCHEDULE so that cash flow for the business is positive.
反而它是根本计划和预定以便现金流动为事务是正面的。
To help ensure your order is shipped on time, please contact BVCPS to plan and schedule your inspections.
为确保您的订单能及时装运,请联系BVCPS为您计划和安排检验。
This contingency plan promoted in this solution includes traffic contingency plan and schedule in an emergency.
该方案提出的交通应急管理模块分交通应急预案和应急调度两项功能。
The problem with most people is not that we don't have enough time but rather how we plan and schedule our time.
对大多数人而言,问题并不在于没有足够的时间,而是不知道如何规划和安排时间。
An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.
评估是项目计划和安排的一个重要组成部分,评估不当的结果就是项目失败。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Knowing how many artifacts, activities, roles, reviews, and steps for evaluation in the RUP, she can better plan and schedule her tasks.
她知道在RUP里有多少工件、活动、角色评审和评估的步骤,因此能够更好地计划和安排她的任务时间表。
A statement of plan and schedule, to convince us (and yourself!) that you can complete this by the end of the term (exact due dates are here).
说明你的计划及时程安排,让我们相信(及你自己)你可以在学期结束前完成。(确实的截止日期起请参考)。
The fourth chapter gives the plan of BL company's purchasing and supply chain management, including management process, plan and schedule, etc.
第四部分是BL公司进行新的采购与供应链管理的实施计划,包括实施范围、管理程序、实施计划和时间安排等。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
The results indicate that the simulation model can help project manager to prepare his risk management plan and schedule plan effectively and efficiently.
结果显示,该模型能够帮助项目经理制定风险管理计划和合理的进度计划。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
The third level is supporting technology level, involving product design facing reverse logistics, product track management, production plan and schedule of remanufacturing.
第三层是支撑技术层,主要包括面向逆向物流的产品设计、产品跟踪管理、再制造生产计划和调度。
Please plan a daily schedule that can alter our natural chronobiological rhythms which engages with logic, reason and ideas.
请计划一个可以改变我们自然生物钟的每日时间表,要涉及逻辑、理性和思想。
Once in Decide, look up your schedule and plan ahead.
在决定之水桶,你查找你的时间表和计划。
Plan out a reasonable break schedule and stick to it.
规划出合理的休息时间表,并坚决执行。
We tend to believe that a carefully laid-out plan and tight schedule is the only way to develop a new piece of software.
我们更倾向于相信,谨慎安排的计划和排得紧凑的进度是开发新软件时的唯一途径。
Build a risk management plan that includes plans for dealing with risks related to technical issues, schedule, and cost.
应构建风险管理计划,包括处理与技术问题、日程表和成本相关风险的计划。
Of course, run time migration does require careful planning and so the training schedule should be adjusted to accommodate the time required to assemble and test an effective migration plan.
当然,运行时迁移也需要仔细的计划,因此培训进度也需要进行适当的调整,以适应编制和测试有效的迁移计划所需的时间。
The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.
另一方面,项目管理者更加关注从资源、进度和成本等方面管理项目计划。
The Deployment Plan provides a detailed schedule of events, persons responsible, and event dependencies required to ensure successful cutover to the new system.
部署计划提供了一个详细的事件进度计划,人员职责,以及必要的事件依赖,以确保对新系统的成功完成。
Planning - Define a strategy to develop and deliver a project plan, calculate overall and detailed sizing, define a work schedule, and establish milestones for major checkpoints.
计划 ——定义项目战略,包括开发和交付项目计划、计算总规模和各个部分的规模、定义工作进度表和为主要检查点建立里程碑。
Just like you schedule your runs, you also have to plan to get (and keep) yourself motivated to run.
就像你准备好了跑步计划,你还是不得不使你自己获得(和保持)跑步动力。
Just like you schedule your runs, you also have to plan to get (and keep) yourself motivated to run.
就像你准备好了跑步计划,你还是不得不使你自己获得(和保持)跑步动力。
应用推荐