After each deposit of veneer on the lift table, core pieces are taken from gluing rolls and laid on the deposited veneer, the end core sheet being supported by a retractable support member.
在每次的单板对存款升降台,核心部件均取自粘辊和单板奠定沉积,最终的核心表由一个可伸缩的支持成员国的支持。
The found of the Dongyuan W deposit set the direction for mineral exploration and laid groundwork for further exploration.
东源大型白钨矿的发现实现了皖南地区地质找矿的新突破,为该地区的矿床勘查工作指出了新方向。
应用推荐