Discusses the feasibility of starting ways of intermediate pressure cylinder with bypass system for imported 300mw turbine, and compare with high pressure cylinder without bypass.
探讨了引进型300 MW机组带旁路中压缸启动方式的可行性,并与不带旁路高压缸启动方式比较。
A suggestion of using back pressure type energy saving turbine generator in place of pressure reducing station to produce intermediate pressure steam is made.
提出了采用背压式节能汽轮发电机组替代减压站生产中压蒸汽的建议。
The paper describes some jamming phenomena at intermediate pressure main stop valve on a 600MW steam turbine, reasons are analyzed and some effective methods are carried out.
描述了某600MW机组中压主汽门的卡涩现象,对各种原因进行了分析,并采取了切实有效的处理方案。
应用推荐