To replace a one-gigawatt coal plant running at 70% of capacity with solar panels would require about half of the 6gw installed worldwide last year.
以太阳能电池板70%的产能替代10亿瓦的火电站运行,大约需要相当于去年全球安装的6gw的一半的装机容量。
The Gezhouba Project is a large run-of-river hydropower plant with an installed capacity of 2715MW.
葛洲坝工程是建在中国长江(扬子江)上的一个大型径流式水电站,其装机容量为2715兆瓦。
The generation expansion optimization involves many specific issues, such as load forecasting, plant types, size of installed capacity, site selection, and so on.
电源优化涉及到很多具体问题,例如:负荷预测、电厂类型、装机规模、厂址选择等等。
应用推荐