The index system falls into four basic parts: object evaluation, system evaluation, factor evaluation and indicator evaluation.
评价指标体系包括四个基本层次结构:目标层、系统层、因素层和指标层。
The index system falls into four basic parts: object level, system level, factor level and indicator level.
评价指标体系包括四个基本层次结构:目标层、系统层、因素层和指标层。
The current generation evaluation index system of power enterprise is still focused on cost analysis of the shortcomings, is a universal indicator system and lacks the specific of power plant.
而现行发电企业经济活动评价指标体系仍然采用的是通用的发电企业经济活动浅析浅析指标体系,缺乏对火力发电企业经济活动的针对性,侧重成本浅析浅析等缺点。
应用推荐