go top

hydrology risk

网络释义专业释义

  水文风险

水文风险

基于1个网页-相关网页

  • 水文风险 - 引用次数:2

    Compound Poisson model and reliability theory are respectively used to calculate hydrology risk rate and engineering structure reliability. The hydrology risk and the engineering risk are considered as compatible events.

    采用复合泊松模型和可靠性分析方法分别计算防洪体系超标洪水水文风险率和工程结构可靠度,将水文风险和工程结构风险视为相容事件,应用选择概率计算综合风险率,并进行综合风险分析。

    参考来源 - 防洪体系超标洪水综合风险分析

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • The bridge ship collision the risk assessment is involves the hydrology, the port navigation, the risk, the bridge and so on many domain interdisciplinary studies.

    桥梁风险评估个涉及水文港航、风险、桥梁多个领域交叉学科问题。

    youdao

  • It is emphasized that risk sources should be identified exactly. Moreover reasonable elusion measures should be made according to geology, hydrology and surrounding environment conditions.

    强调施工过程中正确辨识风险源根据地质水文周围环境条件采取适当规避措施

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定