A general model based on linear programming for short-term generation scheduling of cascade hydroelectric systems is proposed.
建立了基于线性规划的梯级水电系统短期发电计划通用模型。
The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River.
虎跳峡水电站是金沙江中下游梯级的龙头电站,该电站的开发建设对金沙江水电梯级开发和“西电东送”的实施具有重要的战略意义;
All the problems mentioned above, restrict the cascade development of Huanghe River's hydroelectric.
所有这些问题的存在,严重制约了黄河上游水电梯级滚动开发。
应用推荐