And the combination forecasting model is built on the basic of comparing the result of all the models. Finally, the superior model is chosen out as the last forecasting result of the monthly runoff monthly runoff of Hongjiadu hydropower station.
最后,通过比较,挑选各方案中拟合预报结果最优的,作为洪家渡水电站月径流量的最终预报结果。
参考来源 - 洪家渡水电站月径流量预报方案的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The dam site valley of Hongjiadu Hydropower Station is narrow, amplitude variation of water level and discharge at it are large.
乌江洪家渡水电站坝址河床狭窄、水位流量变幅大。
The concrete face rockfill dam of Hongjiadu Hydropower Station located in deep mountain gorge of karst district, its left bank is high bluff side.
洪家渡面板堆石坝处于高山峡谷岩溶地区,左岸边坡陡峻。
Tendering for supervision engineers in main civil projects of Hongjiadu Hydropower Station was strictly followed the state tendering and bidding law.
乌江洪家渡水电站主体工程的监理招标严格按国家招标法进行。
应用推荐