Enter the boiler room and pick up the CROWBAR hanging on the left arch pillar.
进入锅炉房,拿起铁撬左侧拱支柱悬挂。
The article analyzes how the hanging arch is caused during non-pillar sublevel caving in Jingtieshan mine, in order to provide a reference for rational mining organization and resources utilization.
本文着重分析了镜铁山矿无底柱崩落法悬顶问题,为合理安排矿山生产,合理利用矿产资源,提供了参考依据。
It is also planned to be a pillar-less space without view obstructions by the construction project using hanging walls of 1-tsubo grids.
根据项目设计,建筑师使用了半身高的矮墙进行空间分割,使得上层成为了无柱式空间,因此居住者可拥有开阔的视野。
应用推荐