First cubic meter of concrete is mounted in the rollway of the future dam.
第一立方米混凝土被安放在未来的大坝的滚木坡上。
Thus, our knowledge of the performance of severely shaken concrete DAMS has increased and this knowledge can be applied in a positive and beneficial manner to the design of future DAMS.
因此,我们对强震影响混凝土大坝的只是也增加了,这些知识要以积极、有益的态度对待,运用于未来大坝设计。
It is with the strength of these emotions, as well as the concrete, glass and steel that is brought in day by day, that we will build on the footprints of the past the foundation of the future.
正是因为这些情感的力量,以及一天天堆积起来的混凝土、玻璃和钢筋,我们在过去的脚印上重新出发,为未来铺平道路。
应用推荐