不平衡报价法(Unbalanced bids)也叫前重后轻法(Front loaded):是在总体报价保持不变的前提下,与正常水平相比,提高某些 分项工程的单价,同时,降低另外一些分项工程的单价,以期 望在工程...
基于28个网页-相关网页
CNC front loaded machine 数控前载机车床
Front-loaded 前载 ; 前向负载 ; 前载型 ; 前端装载
the front loaded method 不平衡方法
front-loaded contour 前载分布图 ; 前重后轻分布
front-loaded and block left 左弓步拦
very much front-loaded fare structure 前段路程的收费很高
front-loaded bid 前期调高报价书
front loaded method 不平衡报价法
front-loaded budget 提前预算
The tool consists of a runtime library that must be loaded at startup with the application you wish to monitor and a front-end graphical user interface that displays the results and performs analysis.
该工具由运行时库和前端图形用户界面组成,前者必须在启动所要监视的应用程序时加载,后者可以显示结果和性能分析。
I loaded my bike into the front carriage and sat on a bench next to a small compartment that had "conductor" written in English on the door.
我把自行车装上前面的行李车,自己坐在车凳上,身边有一间小房间,门上用英语写着“售票员”。
'With growth front-loaded in 2010, the progressive tightening won't bear much impact on oil demand in the first half of the year,' said Harry Tchilinguirian, senior oil analyst at BNP Paribas.
法国巴黎银行(BNP Paribas)资深石油分析师基林古瑞安(Harry Tchilinguirian)说,由于在2010年初经济增长便开始发力,渐进的收缩过程在上半年不会对原油需求造成太大的影响。
应用推荐