Fixed-total-cost contract is one of the engineering contracts, and due to its features, the possible risks in construction should be taken seriously.
固定总价合同是工程施工合同的一种方式,由于它自身特点,所以要认真对待施工中可能出现的各种风险。
The Balance sheet starts with the total cost of its fixed assets and any trade investments followed by a breakdown of net current assets.
资产负债表一开头是公司的固定资产总额和公司的投资总额,接着是净流动资产分类。
The best chance in terms of funds of the bridge consolidation is fixed on the principle of "economic life" of the bridge and "the lowest total cost" within the bridge using period.
桥梁加固经济合理时机,是按桥梁的经济寿命和按桥梁任务期内总费用最低原则确定的,即总费用最低时的时间为桥梁的加固时机。
应用推荐